{"title": "This Week at Dobson: April 3","images":[{"caption":"The Positiv case is coming along very well. This week the carvings are being installed. ","src":"http://www.saintthomaschurch.org/uploads/photos/10364163_515122008682677_2302809028847428463_n.jpg"},{"caption":" ","src":"http://www.saintthomaschurch.org/uploads/photos/12924624_515122068682671_1561438211624042828_n.jpg"},{"caption":" ","src":"http://www.saintthomaschurch.org/uploads/photos/12928378_515121822016029_3500539526381099537_n.jpg"},{"caption":"A portion of the lower case while on the shop floor. The shorter columns at the right will stand on the gallery rail, while the central area will hang in front of it. ","src":"http://www.saintthomaschurch.org/uploads/photos/12974294_515122172015994_1151430860696558167_n.jpg"},{"caption":"While the case is standing on the floor of the shop, Theshorter columns at the right will stand on the gallery railing and the central area will hang in front of the gallery railing. ","src":"http://www.saintthomaschurch.org/uploads/photos/12985508_515121962016015_5750125283104491599_n.jpg"},{"caption":"We are starting to mount carvings made on our new CNC router on the tower top friezes. ","src":"http://www.saintthomaschurch.org/uploads/photos/12923361_515122718682606_9206055260669424648_n.jpg"},{"caption":"We have placed some of the crestings and spires, including this memorial panel. ","src":"http://www.saintthomaschurch.org/uploads/photos/12928206_515121598682718_7155385927109754262_n.jpg"},{"caption":"Bob is cleaning up and restoring several old Skinner style tremulants. ","src":"http://www.saintthomaschurch.org/uploads/photos/12923291_515123102015901_117382447635609880_n.jpg"},{"caption":"Pipemaking continues. ","src":"http://www.saintthomaschurch.org/uploads/photos/12924607_515121725349372_4579874923280139639_n.jpg"},{"caption":"The stack of finished wind trunks grows bigger every day. ","src":"http://www.saintthomaschurch.org/uploads/photos/12928424_515122398682638_2980483385818436475_n.jpg"},{"caption":"A Spire Flute ready for washing the size off after all the soldering is finished. ","src":"http://www.saintthomaschurch.org/uploads/photos/12936560_515121635349381_8863511702982170443_n.jpg"},{"caption":"He is also copying them so that we can make three new ones as well. ","src":"http://www.saintthomaschurch.org/uploads/photos/12938367_515122658682612_3738461699950350528_n.jpg"},{"caption":"The last of the slider motors are being mounted and wired to the windchests. ","src":"http://www.saintthomaschurch.org/uploads/photos/12961704_515123048682573_3643922624541077203_n.jpg"},{"caption":"These are the canisters caps for a Chimney Flute, having had their initial cleaning. ","src":"http://www.saintthomaschurch.org/uploads/photos/12987119_515121465349398_4624215211145473064_n.jpg"}]}